The frame skew assignment is only used to account for bridge skews (to adjust lane loading, etc.) in spine bridge models developed using the bridge modeler in SAP2000.
The frame skew assignment is only used to account for bridge skews (to adjust lane loading, etc.) in spine bridge models developed using the bridge modeler in SAP2000.