You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 22 Next »

Tutorial

Name:

Influence-based moving-load analysis first steps

Description:

Procedure for initiating influence-based moving-load analysis.

Program:

SAP2000

Version:

V12.1.0

Model ID:


Influence-based moving-load analysis is initiated through the following process:

  • Define vehicle type through Define > Bridge Loads > Vehicles.
  • Define vehicle class through Define > Bridge Loads > Vehicle Classes.
  • Define the lane through Define > Bridge Loads > Lanes.
  • Define a moving-load case through Define > Load Cases > Add New Load Case. Set the load-case type to Moving Load, then specify the vehicles and lanes assigned to this moving load, as shown in Figure 1:


See Also

  • No labels